Office
Powerhouse Brattørkaia
- Category
- Office
- Location
- Trondheim
- Year
- 2018–2019
- Main contractor
- Skanska Norge AS
- Completed
- 2019
- Scope
- ~20,000 m² of ceilings — acoustic ceilings, monolithic ceilings, and stretched-metal ceilings
The world's northernmost energy-positive office building — it produces more energy than it consumes over 60 years. For Skanska Norge, Valtec delivered around 20,000 m² of ceilings: several types of acoustic ceilings, acoustic monolithic ceilings, and stretched-metal ceilings. The package was ceilings only — no glass, no plasterboard — and solved what many considered impossible: balancing acoustic comfort with exposed thermal mass. Completed in 2019.