Transit hub
Nye Trondheim S
- Category
- Transit hub
- Location
- Trondheim
- Year
- 2024–2025
- Main contractor
- Veidekke Entreprenør AS
- Completed
- 2025
- Scope
- ~15,000 m² of ceilings — slats and slat ceilings, slats on the slab edges in the terminal, plasterboard and glass walls
Norway's new central station in Trondheim, built above active railway tracks with full train traffic throughout construction. For Veidekke Entreprenør, Valtec delivered around 15,000 m² of ceilings — slats, slat ceilings, and system ceilings, plus slats on the slab edges in the terminal — as well as a substantial wall package in plasterboard and glass across the terminal and office areas. Completed in 2025.